{"id":4285,"date":"2018-09-20T21:58:36","date_gmt":"2018-09-20T21:58:36","guid":{"rendered":"http:\/\/0"},"modified":"2018-09-20T21:58:36","modified_gmt":"2018-09-20T21:58:36","slug":"the-works-in-the-karavanke-road-tunnel-will-be-delayed","status":"publish","type":"post","link":"https:\/\/www.aacc.co.at\/en\/the-works-in-the-karavanke-road-tunnel-will-be-delayed\/","title":{"rendered":"The works in the Karavanke Road Tunnel will be delayed"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">Due to the complaints of the two non chosen bidders\u00a0 at the Slovenian highway\u00a0 company DARS\u00a0 d.d.\u00a0 the planned construction\u00a0 of the second tube\u00a0 in the tunnel will be delayed\u00a0 for some months. According to the original plan the first works in the tunnel should start within this month. In July 2018 the order for construction was given to the Turkish building group Cegniz Insaat, which was with its offer of 89,3 million Euros\u00a0 the cheapest among nine applicants.<\/p>\n<p>Against this decision two companies made complaints, namely the Slovenian company Kolektor CPG and\u00a0 the Bosnian company Euro Asfalt.<\/p>\n<p>The Austrian federal agency for motorways\u00a0 Asfinag chose among seven bidders the companies ARGE Swietelsky Tunnelbau GmbH &amp; Co KG and Swietelsky\u00a0 Baugesellschaft m.b.H. with the most competitive offer in the value of 89,8 million Euros\u00a0 for the construction of 4,4 kilometers long Austrian part of the tunnel. In total the tunnel\u2018s length is 7,9 kilometers. The planned second tube of the tunnel is supposed to be finished in five years after the start of the works and should ensure a higher traffic safety, less traffic\u00a0 jams and a higher driving speed.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.aacc.co.at\/wp-content\/uploads\/2018\/09\/kara2.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-4274\" src=\"https:\/\/www.aacc.co.at\/wp-content\/uploads\/2018\/09\/kara2.jpg\" alt=\"\" width=\"1385\" height=\"921\" srcset=\"https:\/\/www.aacc.co.at\/wp-content\/uploads\/2018\/09\/kara2.jpg 1385w, https:\/\/www.aacc.co.at\/wp-content\/uploads\/2018\/09\/kara2-300x199.jpg 300w, https:\/\/www.aacc.co.at\/wp-content\/uploads\/2018\/09\/kara2-1024x681.jpg 1024w, https:\/\/www.aacc.co.at\/wp-content\/uploads\/2018\/09\/kara2-768x511.jpg 768w\" sizes=\"(max-width: 1385px) 100vw, 1385px\" \/><\/a><\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Due to the complaints of the two non chosen bidders\u00a0 at the Slovenian highway\u00a0 company DARS\u00a0 d.d.\u00a0 the planned construction\u00a0 of the second tube\u00a0 in the tunnel will be delayed\u00a0 for some months. According to the original plan the first works in the tunnel should start within this month.<\/p>\n","protected":false},"author":2,"featured_media":4273,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[51],"tags":[57],"class_list":["post-4285","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-english"],"_links":{"self":[{"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/posts\/4285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/comments?post=4285"}],"version-history":[{"count":0,"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/posts\/4285\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/media\/4273"}],"wp:attachment":[{"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/media?parent=4285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/categories?post=4285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aacc.co.at\/en\/wp-json\/wp\/v2\/tags?post=4285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}